Dehydrator Spec Sheet

Conditions

MMSCFD

PSIG at

°F

Note: If a range is given in these conditions, the worst case will be used for sizing and pricing

(If unknown, gas will be assumed to be saturated)

(Attach gas analysis if available)

(Assumed to be 7 lb./MMSCF if not completed)

(Note: Answer the following if Dehy will be installed downstream of a compressor.)

PSIG at

°F

Is there a Filter Separator after the Compressor?
If not, would you like a quote for one?
Specific Design Requirements and Options

PSIG at

°F

KIMRAY

ELECTRIC

What type of Flash Separator is preferred?
Is instrument air available?

PSIG

Is a Charcoal Adsorber required?
If so, does it need to be full flow?

%

Tray Cleanouts in Contactor

Size/Type

OSHA Ladder for Contactor
Contactor mounted on skid
Drip Pan on Skid?
Burner Management System Requirement

Brand

Get Started

We’re committed to providing the best equipment to meet your needs. If you have questions or comments, don’t hesitate to contact us. Our knowledgeable staff are standing by to help you.